Blazor playground

Nova v3.37.0

Preview

Blazor

Implement with your agent

Turn the complete handover into a working Blazor page that fits your application's layout and services.

The generated code captures a visual starting point. The Nova skills guide the agent through integrating that design into your existing application, connecting known behavior and making remaining decisions explicit.

Before you start

Complete Set up the Nova skills. Download the ticket's full handover ZIP. Supply the ZIP if your agent can read it, or extract it into an accessible location and provide the HTML report together with its assets/ folder.

The handover skill requires the complete artifact. If only a screenshot, code snippet or playground link is available, obtain the Download ZIP export from the designer before implementation. The agent can inspect the repository while waiting, but the preview alone is insufficient.

Give the agent a concrete task

Adapt this prompt to the ticket's actual route and services:

textUse the Nova design-system and handover-integration skills to implement
the attached Outages handover in this Blazor application.

Read the full HTML report, its Annotations, screenshots, assets and
Review before use guidance. Use the generated implementation code
as the starting point and preserve the designer's visual intent.

Integrate it at [route] using [existing layout]. Reuse the existing
header and sidebar. Connect [existing services/models] and implement
the ticket's acceptance criteria. Identify any mock data or missing
business behavior instead of inventing an endpoint or successful save.

Work through the review items, validate Nova APIs against our installed
documentation, and compare the running page with the captured design.
Report the checks performed, decisions made and unresolved questions.

Let the artifact guide implementation

The agent reads full annotation bodies first and maps them to the relevant layers. For Outages, that might establish date-filter behavior, navigation state and narrow-screen priorities before it chooses an implementation.

The application already owns its shell, routes, spacing and scrolling. A full-frame export may repeat those elements; reuse the existing shell and integrate the required page content. Split repeated UI into components along the application's existing boundaries, rather than creating a new component for every Figma wrapper.

Connect established services and actions. When a service is missing, use the project's mock-data pattern for the agreed UI behavior and identify the missing integration. Ask the designer or product owner about materially ambiguous business behavior.

Work through assets and review guidance

Inspect the supplied image and SVG files. Preserve genuine artwork. Rebuild charts or flattened interactive UI as semantic, responsive components using the application's existing libraries where available.

For each Review before use item, read its complete explanation, source/generated comparison and verification steps. Inline REVIEW(nova): comments are only short leads. A review may confirm the conversion is acceptable without changing code; removing a comment or checking a report box is not evidence that the result works.

Use screenshots to catch differences that were not flagged, including missing controls, incorrect cropping or misunderstood layout. Resolve exact compatibility equivalents using the installed Nova documentation. Surface unresolved visual conflicts rather than silently choosing an approximate token or redesigning the frame.

Ready for the next step

The page is integrated, known behavior is connected, mocks and open questions are identified, and review decisions are recorded. Ask the agent for its implementation report and continue with Review and finish.